Nested cutting lists, offcut policy and kiln losses - how yield engineering keeps restaurant chairs prices stable.
Yield starts at the board
The price of a restaurant chair frame hides a cutting list. How parts are nested on the board decides how much of the timber becomes product and how much becomes shavings - and yield is engineered, not hoped for.
Contract sections run heavier than domestic: 45 to 55 mm legs, 25 to 30 mm rails, and a stretcher on the models that get dragged rather than lifted. The extra section is not for show — it is what survives a room being re-set several times a day.
Ash carries most of this programme and rubberwood covers the rest, both bought to a specification that assumes contract service: ash where the frame takes a daily racking load, rubberwood where the price point has to work.
Cutting lists are nested per model
Parts are nested by length and grain direction before the saw runs. The offcut policy is written: what is kept, what is binned, and what goes to smaller parts of other models.
Contract frames are machined heavier: legs at 45 to 55 mm, rails at 25 to 30 mm, and a stretcher mortised in on the models that get dragged rather than lifted. That stretcher joint decides whether the chair survives a year of being pulled across a floor.
| Stage | Control | Result |
|---|---|---|
| Cutting | Nested parts lists | Yield engineered per model |
| Offcuts | Written policy | Kept, reused or binned |
| Cloth | Nested markers | Fabric waste controlled |
| Kiln degrade | Metered | Feeds timber selection |
| Packing | Right-sized cartons | Freight is waste too |
Where waste lives
Cloth gets the same treatment
Upholstery covers are nested markers for the same reason - fabric waste is money too, and the marker is the difference between a competitive quote and a fat one.
Covers are chosen for cleanability: PU, leather and tight-weave fabric, abrasion 30,000 rubs and up. A restaurant that cannot wipe a seat down in ten seconds will not keep it in service for a year.
Kiln losses are counted
Drying is not free of losses; degrade is metered and fed back into timber selection so the next batch buys better.
Contract sections are thick, and with 490 models this category is most of what goes through the kiln. Thick stock dries slowly and checks if pushed, so the charge is grouped by section and the schedule is written to the thickest blank in it.
Why waste control is the buyer's business
A factory that controls yield quotes stable prices across orders. One that doesn't quotes whatever the offcut bin looks like that week.
Two per carton, 0.10 to 0.15 m³, stackable or knock-down. MOQ is 6 pieces per model, and most buyers run two to four models in one container.
The catalogue lists 486 models in this category: 85% on a solid or wood frame and 15% with an upholstered or soft cover.
Reference
Questions
Does yield affect my price?
Directly. A nested cutting list is why repeat orders hold their price instead of drifting up.
Can I buy the offcuts?
No - offcuts feed smaller parts and the bin; they are not a product.
Is nested cutting only about cost?
It is also about grain direction - the nesting respects grain, so yield and quality move together.
How does packing relate to waste?
An oversized carton wastes board and freight at the same time; cartons are sized to the restaurant chair, not to a standard box.