Incoming, in-process and final inspection, what the load rig does to a dining armchair frame, AQL levels and the retained-sample system that keeps repeat orders consistent.
Three inspection points, not one
Incoming material, in-process, and final. Final-only inspection is the most common weakness in furniture supply: by the time a defect is found the whole batch has it.
Incoming covers timber moisture, board grade, foam density, fabric rub count and hardware. In-process covers joint fit, glue coverage and sanding. Final covers dimensions, finish, upholstery and packing.
Load testing
One frame per production batch goes on the rig: seat cycling, backrest thrust, horizontal leg force, drop, and stability. The standard we build to is EN 12520 for domestic use, EN 16139 Level 2 for hospitality use. Readings are logged against the batch.
Third-party reports for the specific model are raised by SGS, TÜV or Intertek and sent with the quotation rather than after it.
| Point | What is checked | Frequency |
|---|---|---|
| Incoming (IQC) | Moisture, board grade, foam density, fabric rubs | Per batch |
| In-process (IPQC) | Joint fit, glue coverage, sanding quality | Hourly patrol |
| Load test | Seat cycling, back thrust, leg force, drop, stability | 1 frame per batch |
| Final (FQC) | Dimensions, finish, upholstery, carton | AQL 2.5, critical 0 |
| Pre-shipment | Loading photographs, carton count, documents | Per container |
Inspection plan
Sampling levels
Final inspection runs on an AQL basis agreed with the buyer; 2.5 is the usual default for furniture. Critical defects — anything structural — are zero-tolerance regardless of the level. Our wooden dining armchairs are built to the same inspection plan on every order size.
Retained samples
Every approved model keeps a sealed reference: a finished frame panel, a fabric cutting, and one assembled chair. Repeat orders are checked against them before the run starts. This is the mechanism that stops a programme drifting over years.
What fails most often
In order: finish defects (runs, dust nibs, orange peel), dimensional drift on a multi-part assembly, upholstery seam alignment, and then structural issues, which are rare because they are caught at machining. The ranking is useful because it tells you where inspection effort should go on a buying trip — the finish booth, not the load rig.
Structural defects are rare and serious: one in a batch means the fixture drifted, which means every frame since the last check is suspect, which is why the load test runs per batch rather than per order.
Dimensional inspection, which is where drift starts
Strength is tested once a batch; dimensions are checked every hour. A fixture wears, a stop moves, and a rail comes out 1.5 mm short — enough that a seat frame racks, not enough that anyone sees it on the line.
The check is against a retained sample rather than against a drawing, because the sample is what the buyer approved and the drawing is what someone typed.
Controlling bought-in parts
Foam, covering, glides and hardware are inspected on arrival: foam for density and recovery, covering for rub count and colour lot, hardware for plating and thread. Bought-in parts are where a factory's own quality system stops, and where a lot of field failures start.
If a buyer specifies a branded component — a particular fabric, a particular glide — the mill's certificate comes with it and goes into the batch file.
Calibration and the rig itself
Load frames and callipers are calibrated on a schedule and the certificate is on file. An uncalibrated rig produces numbers that look plausible and mean nothing, which is worse than having no rig at all.
In-house testing is for process control: it tells us whether this batch matches the last one. Third-party testing is for the buyer's file: it tells a tender committee that an independent laboratory saw the same thing. Both are needed and they are not substitutes.
Records
Batch records run for the life of the model: moisture readings, load test logs, inspection sheets, colour reference panels and the retained sample. If a buyer asks two years later what a particular container was tested to, the answer is on file rather than reconstructed.
That archive is also how a repeat order is matched. The wooden dining armchairs we list each carry a reference file that survives staff turnover, which is the usual reason a programme drifts.
What the buyer should do on arrival
Open cartons within a week, check the count against the packing list, check the moisture reading, and photograph anything damaged before it is moved. Damage claims are straightforward in that window and progressively harder afterwards.
Reference
Questions
Do you test every chair?
No - one frame per production batch goes on the rig, plus AQL-based final inspection with zero tolerance for structural defects.
Who issues the test reports?
SGS, TÜV or Intertek, raised against the specific model ordered.
What should I check when the container arrives?
Carton count against the packing list, the moisture reading, and photographs of any damage before the cartons are moved.