Guangdong Chair Factory Notes Production floor, Longjiang · Foshan

Factory Notes › Wooden Lounge Chairs

Line Capacity: How Many Lounge Chairs a Day, and What Limits It

Why daily output for lounge chairs depends on the model mix, the season and the bottleneck - and how dates are planned from that.

Updated 2026-11-07Longjiang, Foshan11 min read

Why daily output for lounge chairs depends on the model mix, the season and the bottleneck - and how dates are planned from that.

These notes come off the production floor in Longjiang, Foshan. The current wholesale wooden lounge chairs range is on the main site, with a specification page for every model in it.

Capacity is a model-mix question

The honest answer to "how many lounge chair a day" is "of which model". A simple frame runs fast; an upholstered lounge chair with a deep finish takes the same bench hours as two simple ones. Quotations are planned against the mix, not against an average.

The bulky end of the catalogue: 0.22 to 0.34 m³ per carton, one piece, fully assembled. Freight dominates the landed cost, which is why buyers consolidate them with flatter models. MOQ is 4 pieces, and 2 on some models.

What the mix looks like right now

The catalogue lists 225 models in this category: 1% on a solid or wood frame and 99% with an upholstered or soft cover.

The most common order quantity in this category is 4 pcs (144 models ship at that level).

FactorEffectPlanning note
Model complexityFrame vs upholsteredSets bench hours
Finish systemCoat countBooth time per piece
SeasonCNY and peaksLead time +/- weeks
MixSimple vs detailed lounge chairsBottleneck location
SurgeOvertime, quotedNever free

Capacity factors

The bottleneck moves with the order

Finishing and upholstery are the usual limits; a plain-frame lounge chair run is limited by machining instead. Knowing where the bottleneck sits is how a promised date is built.

Most of the frame here is machined for fit rather than for appearance: rails at 30 to 40 mm, a shaped ply or webbed seat deck, and no exposed joinery worth naming. Tolerance matters where the cover meets the frame, not where the eye looks.

Seasonality is real

Pre-Chinese-New-Year months run at full stretch and lead times stretch with them; post-holiday months have slack. Buyers who plan around the calendar get better dates than buyers who plan around hope.

The bulky end of the catalogue: 0.22 to 0.34 m³ per carton, one piece, fully assembled. Freight dominates the landed cost, which is why buyers consolidate them with flatter models. MOQ is 4 pieces, and 2 on some models.

What surge capacity actually costs

Yes, the line can sprint - with overtime and with finish quality held by inspection rather than by schedule. It is available, it is quoted, and it is never free.

Comfort testing counts as much as strength here: foam compression set under repeated loading, cover abrasion, and a frame fatigue test at Level 1 or Level 2 depending on the traffic the lobby actually sees.

Questions

What is your daily output for lounge chairs?

It depends on the model mix; quotations carry a production plan with the bottleneck named, not a round number.

Can you hold a peak-season date?

Dates are promised against the calendar, not against hope - peak-season orders are booked with the stretch priced in.

Why did my simple model run late?

If the mix that week was upholstery-heavy, the simple frames queue behind the booth. The plan, not the promise, is what to read.

How early should I book a big wooden lounge chairs order?

Ahead of the pre-holiday stretch if possible; the production calendar is the honest constraint.