Guangdong Chair Factory Notes Production floor, Longjiang · Foshan

Factory Notes › Restaurant Chairs

Restaurant Chairs for Hotel Projects: Specs, Volume and Schedule

Document sets, housekeeping-grade durability and backwards scheduling - what a hotel order for restaurant chairs actually contains.

Updated 2026-11-04Longjiang, Foshan11 min read

Document sets, housekeeping-grade durability and backwards scheduling - what a hotel order for restaurant chairs actually contains.

These notes come off the production floor in Longjiang, Foshan. The current wholesale restaurant chairs range is on the main site, with a specification page for every model in it.

Hotel projects buy specifications, not chairs

A hotel order for restaurant chairs is a document set: load ratings, fire and emission paperwork, finish systems, spares policy. The catalogue photo is the smallest part of it.

Two per carton, 0.10 to 0.15 m³, stackable or knock-down. MOQ is 6 pieces per model, and most buyers run two to four models in one container.

Durability graded for housekeeping

Hotel seating is cleaned hard and often. Covers, finishes and foam densities are specified against that routine, and the retained sample is kept against the property's standard.

EN 16139 Level 2 is the contract grade: higher cycle counts on seat and back, a leg forward load, and a stability test that assumes the user does not sit down gently. Reports are raised per model, not per range.

This stock moves in volume and it is metered at packing as well as at the kiln, because a container of restaurant seating sits in a humid port before it is unloaded, and the reading at destination is the one that matters.

ItemWhat it isWhere it lands
DocumentsLoad, fire, emissionDecided before sample
DurabilityHousekeeping-grade specsRetained sample per property
ConsistencyOne fixture set per orderWaves match
ScheduleBackwards from installDelivery plan in the quote
SparesHardware + touch-upPer floor

Hotel order checklist

Volume and consistency

Floor-by-floor consistency is a fixture question - the same jig set runs the whole order, and a second production wave a year later matches because the tooling is kept.

Contract frames are machined heavier: legs at 45 to 55 mm, rails at 25 to 30 mm, and a stretcher mortised in on the models that get dragged rather than lifted. That stretcher joint decides whether the chair survives a year of being pulled across a floor.

Schedule around the opening

Hotel openings do not move. Production is planned backwards from the install date, including packing, container space and customs lead - the delivery plan is part of the quote.

Two per carton, 0.10 to 0.15 m³, stackable or knock-down. MOQ is 6 pieces per model, and most buyers run two to four models in one container.

What ships with a hotel order

Spare hardware, touch-up kits and aftercare sheets per floor, so the property team runs maintenance without calling the factory.

This stock moves in volume and it is metered at packing as well as at the kiln, because a container of restaurant seating sits in a humid port before it is unloaded, and the reading at destination is the one that matters.

References hotel buyers shortlist: A0055 (Solid wood, MOQ 6 pcs), XY-24018 (Solid wood, MOQ 6 pcs), A003 (100% Solid Wood, MOQ 6 pcs).

Questions

Do you work with hotel FF&E schedules?

Yes - send the schedule; restaurant chairs specifications are returned line by line.

Can production waves be split across a year?

Yes, with fixture sets retained so later waves match the first.

What paperwork ships with the order?

Load ratings and the emission/finish documentation the destination requires.

How are hotel quantities priced?

Volume breaks follow the MOQ table; restaurant chairs orders of this size are quoted on the production plan, not a single number.