Guangdong Chair Factory Notes Production floor, Longjiang · Foshan

Factory Notes › Wooden Lounge Chairs

How Lounge Chairs Are Built: Inside a Foshan Chair Line

The seven operations a lounge chair passes through in our Longjiang factory - equipment, cycle time and the inspection checkpoint at each stage.

Updated 2026-11-14Longjiang, Foshan14 min read

The seven operations a lounge chair passes through in our Longjiang factory - equipment, cycle time and the inspection checkpoint at each stage.

These notes come off the production floor in Longjiang, Foshan. The current wholesale wooden lounge chairs range is on the main site, with a specification page for every model in it.

One site, seven operations

Every lounge chair we ship passes through the same building in Longjiang. Nothing is outsourced except the plating of metal components, which is why a question about a joint can be answered in an hour rather than a week.

The line runs: cutting, machining, sanding, assembly, finishing, upholstery, packing. The table below is the actual sequence with the checkpoint at each stage, not a marketing diagram.

Hotel lobbies, waiting areas, senior living, reading corners. Seat height 400 to 430 mm with the back raked further than a dining chair, because the sitter is resting rather than eating. A side table at 350 to 400 mm goes with it.

How lounge chairs differ on the line

A lounge chair is a soft seat on a frame, not a frame with a pad. 220 of the 226 models in this category are upholstered, so the frame is a substrate: it has to hold the foam and the cover in shape under a sitter who stays put for an hour, not one who leaves in twenty minutes.

Frames are wood or metal under the cover, and the load path goes through the seat deck rather than the rails. Webbing or a sprung deck decides how the seat feels after a year more than the timber species does.

StageEquipmentCheckpoint
1. CuttingCross-cut and rip sawsBlank dimensions, grain direction
2. MachiningTenoner, spindle moulder, CNCJoint fit against retained sample
3. SandingThree-grit sequenceSurface inspection under raking light
4. AssemblyGlue, clamp, corner blocksClamp time, squareness, joint gap
5. FinishingFiltered spray boothColour vs sealed reference panel
6. UpholsteryCutting, sewing, fittingSeam alignment, foam density check
7. Packing5-ply carton, EPE, corner boardDrop test on first carton

Production sequence

Cutting and machining

Timber arrives kiln-dried and is cut to blank, then machined on the tenoner and the spindle moulder. This is where the joint geometry is set, and it is the only stage where a mistake is unrecoverable — a tenon cut 1 mm small is a loose joint for the life of the chair.

Most of the frame here is machined for fit rather than for appearance: rails at 30 to 40 mm, a shaped ply or webbed seat deck, and no exposed joinery worth naming. Tolerance matters where the cover meets the frame, not where the eye looks.

The frame is a substrate for upholstery, so sections run lighter than a dining chair: 30 to 40 mm on the load-bearing rails, with a shaped ply or a webbed deck carrying the seat. Timber here is dried for stability rather than for appearance — most of it is never seen.

Sanding, and why it takes three passes

Three grits, progressively finer, with a inspection between the second and the third. Sanding is the operation most likely to be compressed when a line is behind schedule, and it is the one the customer notices first — a finish applied over a poorly sanded frame shows every scratch under a dining room light.

Almost none of the frame shows. What matters is that nothing rough touches the cover from inside: a splinter on a rail wears through fabric from the back within months, which is why upholstered frames are sanded and sealed even where no one will look.

Assembly

The frame is assembled, then the deck is webbed or sprung, then the foam goes on and the cover is fitted. The frame joint is only half the job; the other half is how the soft parts are held in shape, which is a different skill on the line.

Frames for our wooden lounge chairs go through the same fixture set whether the order is 6 pieces or 600.

Upholstery and packing

Covers are cut from nested markers to control waste, sewn, then fitted over foam on a seat deck built the same way every time. Final packing is five-ply carton, EPE between components, corner board on frame ends, and a drop test on the first carton of a new model.

Then the container: cartons are stacked to a loading plan, photographed at three points, and sealed. Those photographs are what settle a damage claim.

Foam density is the specification that matters: 30 to 35 kg/m³ for a lobby, lower for a showroom piece. Covers are velvet, fabric or leather, and where the market requires it we can supply to BS 5852 or CAL 117 — specify at quotation, not after.

The bulky end of the catalogue: 0.22 to 0.34 m³ per carton, one piece, fully assembled. Freight dominates the landed cost, which is why buyers consolidate them with flatter models. MOQ is 4 pieces, and 2 on some models.

What lounge chairs look like in our catalogue

There are 225 models in this category: 1% run on a solid wood frame and 99% carry an upholstered or soft cover. The mix decides what the line has to be good at.

Three of them as they stand today: GDC-5652 (Velvet/Fabric/Leather, MOQ 4 pcs), GDC-5652 (Velvet/Fabric/Leather, MOQ 4 pcs), GDC-5652 (Velvet/Fabric/Leather, MOQ 2 pcs).

Where lounge chairs fail in service

Seats that bottom out, covers that pill at the front edge, and frames that creak because the deck was stapled rather than webbed. Comfort complaints are almost always foam density, not frame strength.

Comfort testing counts as much as strength here: foam compression set under repeated loading, cover abrasion, and a frame fatigue test at Level 1 or Level 2 depending on the traffic the lobby actually sees.

Questions

Where is the factory?

Longjiang, Shunde, Foshan, Guangdong. All seven operations run in one building; only metal plating is outsourced.

Can I visit?

Yes. Buyers are welcome on the line. A factory that runs its own line will show all of it.

How long does a run take?

25 to 40 days from deposit depending on finish and season, plus 7 to 15 days for a sample if the model is new to us.

What is different about building lounge chairs?

A lounge chair is a soft seat on a frame, not a frame with a pad. 220 of the 226 models in this category are upholstered, so the frame is a substrate: it has to hold the foam and the cover in shape under a sitter who stays put for an hour, not one who leaves in twenty minutes.

What fails first on lounge chairs?

Seats that bottom out, covers that pill at the front edge, and frames that creak because the deck was stapled rather than webbed. Comfort complaints are almost always foam density, not frame strength.