The six cost layers behind a lounge chair quotation, the four legitimate ways to reduce price, and the three shortcuts that cost more than they save.
Six layers, in order of size
Timber, labour, finishing, upholstery, packing, then overhead and currency. On a solid wood frame the timber is the largest single line and the most volatile, which is why quotations carry a validity period rather than a fixed price.
Where the money actually goes
Machining and sanding dominate the labour line: they are the operations that cannot be compressed without the customer seeing it. Finishing cost is driven by the number of coats and the system — a water-based system costs more per litre and needs a longer flash-off, which is floor time.
Upholstery splits into cover and foam. A contract-grade fabric at 40,000 rubs costs several times a domestic-grade one, and it is the single upgrade that most extends service life in lounges and lobbies.
| Layer | Share of ex-works cost | Main driver |
|---|---|---|
| Timber | 30-40% | Species, grade, market price |
| Labour | 20-28% | Machining, sanding, assembly |
| Finishing | 8-14% | System, number of coats, flash-off time |
| Upholstery | 8-20% | Cover grade, foam density |
| Packing | 4-7% | Carton ply, protection, pallet |
| Overhead and currency | 8-12% | Factory overhead, FX, seasonality |
Cost structure
How to reduce cost without reducing the chair
Four legitimate levers. Take a stock model in a stock finish — no fixture setup, no colour matching. Increase the quantity, which spreads the setup across more pieces. Simplify the packing specification if the route is short. And accept a longer lead time so the run can be batched with a similar order.
What does not work: thinning the carton, dropping from three sanding grits to two, or moving from a glued-and-screwed corner block to a stapled one. Wooden Lounge Chairs are quoted with the full specification on the sheet so you can see which line you are changing.
What moves the price that is not the chair
Exchange rate, timber market, coating cost, and season. A quotation held open for three months is a quotation the factory has priced risk into.
Timber is the volatile line
Board prices move with supply, freight and the exporting country's policy, and they move faster than a factory can absorb. That is the honest reason a quotation carries a validity period. Locking a price for six months means the factory has priced the risk into it, and you are paying for the option whether or not the market moves.
Hedging it properly means agreeing a validity period and a re-quotation trigger, rather than a fixed price that quietly degrades the specification later.
The labour line is mostly machining and sanding
Cutting is fast, machining is skilled, sanding is slow and unreplaceable, assembly is quick, finishing is chemical rather than manual, and upholstery is skilled again. The hours sit where the quality sits, which is why the two cannot be separated in a quotation.
When a price comes back well below the field, the missing money is almost always in one of those two operations — fewer grits, or a fixture run past its tolerance.
Currency, terms and landed cost
Prices are quoted in USD on FOB Shenzhen, with EXW and CIF available. Payment is normally 30 percent deposit with the balance against documents or before loading. Currency moves against the factory, not the buyer, inside the validity period, and against the buyer outside it.
For comparison across suppliers, always convert to landed cost per piece: ex-works price, inland haulage, documentation, ocean freight, insurance, duty and destination handling. A quote 5 percent cheaper ex-works is frequently more expensive landed once packing volume is taken into account — a thinner carton raises the piece count per container in a way that flatters the unit price and costs more in total.
One-off costs that sit outside the unit price
Tooling, if the design needs a bending mould or a jig. Sample charges, credited against the first production order. Colour matching, if the target is a physical sample rather than a standard finish. And third-party testing if the model is new.
All four are quoted separately and all four are avoidable by starting from an existing model. A buyer who asks for these lines up front gets a truer comparison than one who compares unit prices alone.
Reading a quotation
Ask for the specification on the quotation itself: species, moisture band, finish system, foam density, fabric rub count, carton specification and the standard tested to. Two quotes that differ by 8 percent usually differ by one of those lines, and the cheaper one is cheaper for a reason.
Reference
Questions
How can I lower the unit price?
Stock model in a stock finish, higher quantity, longer lead time for batching, or a simplified packing spec if the route is short.
Why do quotations expire?
Timber and coating prices move, and so does the exchange rate. A long-open quotation has risk priced into it.
Is a cheaper quote the same chair?
Compare the specification lines - species, finish system, foam density, fabric rub count, carton ply. The difference is usually one of them.